FREE sourcing support for qualified business buyers, with an eligible benefit of up to 3%. Eligibility applies to qualified business buyers and is confirmed after we review your product, quantity, destination, and sourcing requirements. That review includes etch versus through-cut and whether the art file already carries kerf compensation.

Independent sourcing partner · routes job-shop one-off art and parts RFQs · NDA available before CAD is forwarded
RFQ packet with nest drawing, thickness coupon and destination note on a desk

custom laser cutting services

This matching desk turns a mixed job-shop packet—one-off branded panels plus functional blanks—into one factory brief. Each bidder must quote the same revision, quantity, inspection pack and destination. We do not cut metal and we do not absorb tooling or freight risk.

Open the cut list

Requirements every supplier quote must answer

Three gates before a factory reply is usable

1

Brief freeze

We restate your drawing, quantity, destination and Incoterms. Unconfirmed etch depth, through-cut islands, lead time and certificate scope stay labelled as open.

2

Factory outreach

Candidate shops receive the same packet. We do not claim a pre-audited supplier list or an existing capacity reservation.

3

Reply comparison

Assumptions, exclusions, validity dates and inspection coverage are lined up. Lowest unit price is not treated as lowest landed cost.

Questions buyers raise before award

Etch or through-cut on this branded panel?

Those are different power, speed, and pass counts. An etch (mark) leaves the panel intact and is scored against a depth or Ra note; a through-cut opens a window or letter. Mixing both on one art file without a written rule lets a bidder price the cheap pass and still claim the logo is “done.” Name which islands etch, which islands drop out, and which faces must stay paint-ready.

Can a shop swap fiber for CO2 without telling us?

Not on a comparable RFQ. Fiber is common on thin metal; CO2 still appears on some non-metal or thick acrylic work. Name the process or list approved alternatives before award.

When is waterjet or punch a better route?

Heat-affected zone, very thick plate, or mixed holes may push the work off laser. Record that as an open process question; do not assume this desk already selected the cell.

How should MOQ and EAU be written?

State prototype quantity, first production lot, and annual usage as three numbers. Nest yield and programming NRE amortize differently across a one-off art panel and a repeating bracket nest.

What stays outside a typical cut quote?

Hardware insertion, weldments, plating, powder, packing for export, duties, and on-site fit-up. If the drawing shows those, force a yes/no on each line.

Do you publish a discount versus “market”?

No. Mill wholesale replies are ranked on one destination and one Incoterm, with freight, duty, and inspection kept in their own columns. Eligible FREE sourcing support of up to 3% is confirmed only after product, quantity, destination and requirements are reviewed.

Send the same brief to more than one factory

Include drawing revision, material, thickness, quantity, inspection, destination and Incoterms. Mark etch versus through-cut on branded panels. Optional budget and high-end / mid-range / economy preference can ride in the requirement field.

Please enter your name.
Please enter a valid email.
Please enter your company.
Please describe the procurement requirement.

Submitting authorizes us to review the requirement and contact possible factories. See our Privacy Policy.